I've removed the springs from 8 of the 9 points in this area.
Now I need to:
- Decide on all the various sections.
- Place sensors in the relevant places and wire them in.
- Wire the sections.
- Place lights without fixing and allow for wiring.
- Fix the track down starting left to right.
- Fix the point motors in place under the layout.
- Build and wire the controller for the points.
- Configure the controller and calibrate the points.