Tuesday 16 October 2012

Photos of the new tunnel work...




Sunday 14 October 2012

Started cutting in ramps and tunnels

I've started cutting in the ramps and tunnels - I decided it was easier to elevate some of the track and cut the track going under into the surface so as to make for a layout that did not have too much height.

This way I can also install the Tram line without having to raise it too high.

Given that the base board is about an inch thick, cutting into it makes a lot of sense.

Pictures tomorrow !