Sunday, 30 December 2012

Updated to-do list...


  1. Clean up - the table, room, floor
  2. Build removable section for town
  3. Build permanent roadbed for tram
  4. Reinforce foam trackbase on various ramps
  5. Lay cork under track in all visible areas
  6. Lay and fix track except to main section 
  7. Create removable tram track section out of timber (NOW)
  8. Lay tram track with sensors and sections plus long wiring
  9. Create tram roadbase - plasticine
  10. Put tram section in place
  11. Create removable town section and set aside
  12. Solder track sections
  13. Add wiring and sensors to all sections
  14. Lay sections and run wiring to control system end points
  15. Remove main section
  16. Create sectional track pieces and solder
  17. Add wiring for power
  18. Remove springs from all points
  19. Lay track sensors and wire in
  20. Lay and fix track
  21. Secure all point servos in place and add main track springs
  22. Test track with basic motor controller system with points held hard in place
  23. Rework point control system software and put point control system in place
  24. Integrate systems and test
  25. Wire signals
  26. Add relay control system for lighting
  27. Place all signals in place, wire lights and test
  28. Plan village layout and add lighting with wiring
  29. Integrate track by returning removable control section and connecting up track
  30. Test by running system with basic software
  31. Write and test complex control software
  32. Scenery comes next